This purpose
of this analysis is to monitor power
availability and usage to
confirm if enough AC electrical power
is presently available at the building
for the clients use. Power availability
and relevant notes will be included
in the report along with testing
data. Sites are monitored for a minimum
of 72 hours or as long as 30 days or
as requested by client. Load Study
reports are provided within
48 hours of monitor removal.