Required by telco
for sites located at or near High Voltage
utility equipment. The purpose of the
analysis is to provide engineering
data to determine the best course of
action with regard to safety in the
event of a ground fault associated
with the High Voltage site. Soil testing
and ground resistance calculations
are included in this study. Fault data
is required from the participating
utility. This test is completed within
1 week of receipt of fault data from
the participating utility. Site plan
required.